Arizona Street Opening Bond
What it is & who requires it
Contractors and utilities opening, excavating, or working within an Arizona city right-of-way. Arizona municipalities require a right-of-way construction assurance (or a co-equal cash deposit, check, or letter of credit) as a permit condition; the obligee and amount are set by the specific city. Contractor licensing itself is statewide through the Registrar of Contractors, so the municipal bond covers right-of-way work, not licensing.
Obligee: Arizona municipal public-works / engineering departments (general-use right-of-way / excavation product). Citation: Arizona municipal right-of-way / street-opening / excavation ordinances and permit assurance requirements (multi-obligee).
Bond amount
Set by the obligee — the exact amount is confirmed automatically when you start your bond in our portal, or call 317-942-0549.
How to get it
This bond is individually underwritten, so it is not issued instantly. Request a quote and a licensed producer follows up to walk you through it.
Request a bond quote
Tell us about the bond and the project. A licensed producer follows up — these bonds are individually underwritten, so they are not issued instantly.
Term & renewal
Term: Per the municipal right-of-way / excavation permit.
Renewal: Per-permit, or per the municipality’s annual authorization.
Filing
Filed with the Arizona city public-works or engineering department that issues your right-of-way or excavation permit. Arizona municipalities require this assurance — satisfiable by a surety bond or a co-equal cash deposit, check, or letter of credit — as a permit condition, so it is listed and the obligee and exact amount, set by the specific city, are confirmed when you apply. It covers jurisdictions beyond the individually listed cities.
Source
This bond requirement is corroborated by multiple public sources; Arizona municipal public-works / engineering departments (general-use right-of-way / excavation product) sets the exact amount, which we confirm when you start your bond.
Related Arizona bonds
Frequently asked questions
- Who requires the Arizona Street Opening Bond?
- It’s required by Arizona municipal public-works / engineering departments (general-use right-of-way / excavation product) (Arizona municipal right-of-way / street-opening / excavation ordinances and permit assurance requirements (multi-obligee)). Contractors and utilities opening, excavating, or working within an Arizona city right-of-way. Arizona municipalities require a right-of-way construction assurance (or a co-equal cash deposit, check, or letter of credit) as a permit condition; the obligee and amount are set by the specific city. Contractor licensing itself is statewide through the Registrar of Contractors, so the municipal bond covers right-of-way work, not licensing.
- How much is the Arizona Street Opening Bond?
- Set by the obligee — the exact amount is confirmed automatically when you start your bond in our portal, or call 317-942-0549.
- How do I get the Arizona Street Opening Bond?
- This bond is individually underwritten, so it is not issued instantly. Request a quote and a licensed producer follows up to walk you through it.
- What is the term?
- Per the municipal right-of-way / excavation permit. Renewal: Per-permit, or per the municipality’s annual authorization.
- Is this bond insurance for me?
- No. It protects the obligee and the public — not you. If a valid claim is paid, you repay the surety.
- How is this requirement verified?
- This bond requirement is corroborated by multiple public sources. The obligee sets the exact amount, which we confirm automatically when you start your bond in the portal or with a producer.