Bloomfield Street Excavation Bond

What it is & who requires it

A contractor that opens or excavates a public street, highway, or right-of-way in Bloomfield must post this permit bond with Town of Bloomfield before the road-opening / excavation permit issues, guaranteeing proper backfill, restoration of the pavement and public way, and reimbursement of the municipality for repairs. (CT preempts municipal general-contractor licensure — the Bloomfield contractor requirement resolves to this public-way bond, not a GC bond.)

Obligee: Town of Bloomfield. Citation: Town of Bloomfield Code, Ch. 17 (Streets and Sidewalks).

Bond amount

Set by the obligee — the exact amount is confirmed automatically when you start your bond in our portal, or call 317-942-0549.

How to get it

This bond is individually underwritten, so it is not issued instantly. Request a quote and a licensed producer follows up to walk you through it.

Request a Quote

Request a bond quote

Tell us about the bond and the project. A licensed producer follows up — these bonds are individually underwritten, so they are not issued instantly.

Term & renewal

Term: Held while the road-opening / excavation permit is active.

Renewal: Posted per permit; maintained while the contractor works in the Bloomfield public way.

Filing

Posted with the Town of Bloomfield before a road-opening or excavation permit issues, under Code Chapter 17, with the security, insurance, and indemnification set in the permit manual. It is listed and the exact amount is confirmed when you apply.

Source

Verified against the obligee source.

Related Connecticut bonds

Frequently asked questions

Who requires the Bloomfield Street Excavation Bond?
It’s required by Town of Bloomfield (Town of Bloomfield Code, Ch. 17 (Streets and Sidewalks)). A contractor that opens or excavates a public street, highway, or right-of-way in Bloomfield must post this permit bond with Town of Bloomfield before the road-opening / excavation permit issues, guaranteeing proper backfill, restoration of the pavement and public way, and reimbursement of the municipality for repairs. (CT preempts municipal general-contractor licensure — the Bloomfield contractor requirement resolves to this public-way bond, not a GC bond.)
How much is the Bloomfield Street Excavation Bond?
Set by the obligee — the exact amount is confirmed automatically when you start your bond in our portal, or call 317-942-0549.
How do I get the Bloomfield Street Excavation Bond?
This bond is individually underwritten, so it is not issued instantly. Request a quote and a licensed producer follows up to walk you through it.
What is the term?
Held while the road-opening / excavation permit is active. Renewal: Posted per permit; maintained while the contractor works in the Bloomfield public way.
Is this bond insurance for me?
No. It protects the obligee and the public — not you. If a valid claim is paid, you repay the surety.
How is this requirement verified?
This bond requirement is corroborated by multiple public sources. The obligee sets the exact amount, which we confirm automatically when you start your bond in the portal or with a producer.

Request your bond

Request a Quote