Pembroke Pines Subdivision / Right-of-Way Improvement Bond

What it is & who requires it

Developers / contractors performing subdivision or right-of-way improvements (roadway, drainage, water/sewer) within Pembroke Pines, Broward County.

Obligee: City of Pembroke Pines (City Engineer / Engineering Division). Citation: City of Pembroke Pines Engineering Standards - General Specifications, Sec. I (Site Plan Review), Subdivision Improvement Bond (p. I-2).

Bond amount

110 percent of the estimated cost of the public (subdivision / right-of-way) improvements - paving, drainage, water, sewer, pavement marking, traffic signs, street lights.

How to get it

This bond is individually underwritten, so it is not issued instantly. Request a quote and a licensed producer follows up to walk you through it.

Request a Quote

Request a bond quote

Tell us about the bond and the project. A licensed producer follows up — these bonds are individually underwritten, so they are not issued instantly.

Term & renewal

Term: Until improvements are completed and accepted

Renewal: N/A (project-based)

Filing

Filed with the City of Pembroke Pines (Engineering Division) before site-plan approval for subdivision or right-of-way improvements such as paving, drainage, water, and sewer. It stays in place until the improvements are completed and accepted on a project basis. Required under the City of Pembroke Pines Engineering Standards, General Specifications, Sec. I.

Source

Verified against the obligee source (last checked 2026-06-07).

Related Florida bonds

Frequently asked questions

Who requires the Pembroke Pines Subdivision / Right-of-Way Improvement Bond?
It’s required by City of Pembroke Pines (City Engineer / Engineering Division) (City of Pembroke Pines Engineering Standards - General Specifications, Sec. I (Site Plan Review), Subdivision Improvement Bond (p. I-2)). Developers / contractors performing subdivision or right-of-way improvements (roadway, drainage, water/sewer) within Pembroke Pines, Broward County.
How much is the Pembroke Pines Subdivision / Right-of-Way Improvement Bond?
110 percent of the estimated cost of the public (subdivision / right-of-way) improvements - paving, drainage, water, sewer, pavement marking, traffic signs, street lights.
How do I get the Pembroke Pines Subdivision / Right-of-Way Improvement Bond?
This bond is individually underwritten, so it is not issued instantly. Request a quote and a licensed producer follows up to walk you through it.
What is the term?
Until improvements are completed and accepted Renewal: N/A (project-based)
Is this bond insurance for me?
No. It protects the obligee and the public — not you. If a valid claim is paid, you repay the surety.
How is this requirement verified?
We verify it against the obligee’s primary source (last checked 2026-06-07); the source link is on this page.

Request your bond

Request a Quote