Kansas Land Disturbance and Erosion Control Bond

What it is & who requires it

Contractors and developers disturbing ground in Kansas cities that run a land disturbance permit program, which is usually tied to the state stormwater discharge permit for construction activity. The requirement scales with the work rather than sitting at one figure: cities commonly exempt disturbance under an acre from any surety, then step the amount by acreage and by the number of dwellings, with a separate annual level for utilities and the contractors working for them. In at least one city the land disturbance permit is a gate in front of the right-of-way permit — a right-of-way application is not complete without proof of a current one — so the two need to be sequenced rather than run in parallel.

Obligee: Kansas cities issuing land disturbance permits. Citation: Municipal codes. Examples: Leavenworth § 18-94 (escrow account or surety bond; tiers by acreage and dwelling count); Shawnee ch. 11.20 (escrow account, letter of credit or surety bond; amount per Policy Statement Code PS-56); Shawnee § 11.20.060 (general land disturbance permit).

Bond amount

Set by the obligee — the exact amount is confirmed automatically when you start your bond in our portal, or call 317-942-0549.

How to get it

This bond is individually underwritten, so it is not issued instantly. Request a quote and a licensed producer follows up to walk you through it.

Request a Quote

Request a bond quote

Tell us about the bond and the project. A licensed producer follows up — these bonds are individually underwritten, so they are not issued instantly.

Term & renewal

Term: Established and maintained throughout the permit period.

Renewal: Per disturbance event, or annually where the city issues a general land disturbance permit to utilities and their contractors.

Filing

Established in the city’s name and maintained for the permit period. No figure is published because a surety bond is only one of the accepted forms in every Kansas version of this ordinance found — an escrow account sits beside it, sometimes with a letter of credit as well — and because the city engineer or director may direct which instrument a particular applicant must use, based on the project and on the applicant’s past performance. That last point is worth planning for: a contractor with a poor compliance history may not be offered the choice. Where a city sets the amount by policy statement rather than in the code, ask public works for the current schedule. Starting work without the permit typically triggers a surety of its own, doubling on a second offense.

Source

This bond requirement is corroborated by multiple public sources; Kansas cities issuing land disturbance permits sets the exact amount, which we confirm when you start your bond.

Related Kansas bonds

Frequently asked questions

Who requires the Kansas Land Disturbance and Erosion Control Bond?
It’s required by Kansas cities issuing land disturbance permits (Municipal codes. Examples: Leavenworth § 18-94 (escrow account or surety bond; tiers by acreage and dwelling count); Shawnee ch. 11.20 (escrow account, letter of credit or surety bond; amount per Policy Statement Code PS-56); Shawnee § 11.20.060 (general land disturbance permit)). Contractors and developers disturbing ground in Kansas cities that run a land disturbance permit program, which is usually tied to the state stormwater discharge permit for construction activity. The requirement scales with the work rather than sitting at one figure: cities commonly exempt disturbance under an acre from any surety, then step the amount by acreage and by the number of dwellings, with a separate annual level for utilities and the contractors working for them. In at least one city the land disturbance permit is a gate in front of the right-of-way permit — a right-of-way application is not complete without proof of a current one — so the two need to be sequenced rather than run in parallel.
How much is the Kansas Land Disturbance and Erosion Control Bond?
Set by the obligee — the exact amount is confirmed automatically when you start your bond in our portal, or call 317-942-0549.
How do I get the Kansas Land Disturbance and Erosion Control Bond?
This bond is individually underwritten, so it is not issued instantly. Request a quote and a licensed producer follows up to walk you through it.
What is the term?
Established and maintained throughout the permit period. Renewal: Per disturbance event, or annually where the city issues a general land disturbance permit to utilities and their contractors.
Is this bond insurance for me?
No. It protects the obligee and the public — not you. If a valid claim is paid, you repay the surety.
How is this requirement verified?
This bond requirement is corroborated by multiple public sources. The obligee sets the exact amount, which we confirm automatically when you start your bond in the portal or with a producer.

Request your bond

Request a Quote