Leawood Improvements Performance and Maintenance Bond

What it is & who requires it

Applicants for Leawood right-of-way construction permits, and developers building the public improvements that come with a new subdivision or development. Which of the two city bond forms applies depends on the work: there is a curb-specific form and a general form, so ask which one the permit requires before ordering. For privately funded public improvements in new developments the principal is the developer rather than a trade contractor, which puts that flavor of the instrument outside a contractor license bond even though it shares the name. Certificates of insurance are required alongside at the city’s stated general liability limits.

Obligee: City of Leawood (Public Works). Citation: Leawood City Code ch. 13 art. 3 (right-of-way construction permits); City of Leawood General Performance and Maintenance Bond Form (2-year); City of Leawood Curb-Specific Performance and Maintenance Bond Form.

Bond amount

Set by the obligee — the exact amount is confirmed automatically when you start your bond in our portal, or call 317-942-0549.

How to get it

This bond is individually underwritten, so it is not issued instantly. Request a quote and a licensed producer follows up to walk you through it.

Request a Quote

Request a bond quote

Tell us about the bond and the project. A licensed producer follows up — these bonds are individually underwritten, so they are not issued instantly.

Term & renewal

Term: Two years — the city requires a two-year general performance and maintenance bond.

Renewal: Per permit or per development.

Filing

Filed on one of the city’s own bond forms — a general two-year performance and maintenance form, or a curb-specific form. No figure is published because the bond is written in the amount of the cost of the public improvement, which is a per-project number rather than a schedule. The clearest confirmation that the amount tracks project value is in the fee rule itself: the city charges the permit fee at a percentage of the total construction cost or the bond amount, which only makes sense where the bond equals the value of the work. Read the code article behind the permit rather than the permit page alone if the principal on a particular job is unclear, because the developer flavor and the contractor flavor of this instrument are administered together.

Source

This bond requirement is corroborated by multiple public sources; City of Leawood (Public Works) sets the exact amount, which we confirm when you start your bond.

Related Kansas bonds

Frequently asked questions

Who requires the Leawood Improvements Performance and Maintenance Bond?
It’s required by City of Leawood (Public Works) (Leawood City Code ch. 13 art. 3 (right-of-way construction permits); City of Leawood General Performance and Maintenance Bond Form (2-year); City of Leawood Curb-Specific Performance and Maintenance Bond Form). Applicants for Leawood right-of-way construction permits, and developers building the public improvements that come with a new subdivision or development. Which of the two city bond forms applies depends on the work: there is a curb-specific form and a general form, so ask which one the permit requires before ordering. For privately funded public improvements in new developments the principal is the developer rather than a trade contractor, which puts that flavor of the instrument outside a contractor license bond even though it shares the name. Certificates of insurance are required alongside at the city’s stated general liability limits.
How much is the Leawood Improvements Performance and Maintenance Bond?
Set by the obligee — the exact amount is confirmed automatically when you start your bond in our portal, or call 317-942-0549.
How do I get the Leawood Improvements Performance and Maintenance Bond?
This bond is individually underwritten, so it is not issued instantly. Request a quote and a licensed producer follows up to walk you through it.
What is the term?
Two years — the city requires a two-year general performance and maintenance bond. Renewal: Per permit or per development.
Is this bond insurance for me?
No. It protects the obligee and the public — not you. If a valid claim is paid, you repay the surety.
How is this requirement verified?
This bond requirement is corroborated by multiple public sources. The obligee sets the exact amount, which we confirm automatically when you start your bond in the portal or with a producer.

Request your bond

Request a Quote