Louisville MSD Floodplain Elevation Certificate Bond

What it is & who requires it

Anyone constructing a new building or addition in, or immediately adjacent to, a mapped (FEMA or local regulatory) floodplain, who must post the bond before MSD issues the floodplain permit.

Obligee: Louisville/Jefferson County Metropolitan Sewer District (MSD). Citation: Louisville/Jefferson County MSD — Single Family, Small Commercial or Demolition Permit, 'Bonds' section (also stated on the MSD Flood Permitting page).

Bond amount

The required bond amount is $1,000.

How to get it

This bond issues online — get bonded through our portal, usually in a single sitting once you confirm the bond, amount, and obligee.

Get Your Bond Online Call 317-942-0549

Term & renewal

Term: Held until the final/finished-construction Elevation Certificate is reviewed and approved by MSD

Renewal: Not applicable (per-project; released on Elevation Certificate approval)

Filing

Filed with the Louisville/Jefferson County Metropolitan Sewer District (MSD) before it issues a floodplain permit for construction in or immediately adjacent to a mapped floodplain. It is held per project until the finished-construction Elevation Certificate is reviewed and approved; a certified check, letter of credit, surety bond, or cash is accepted.

Source

Verified against the obligee source (last checked 2026-06-05).

Related Kentucky bonds

Frequently asked questions

Who requires the Louisville MSD Floodplain Elevation Certificate Bond?
It’s required by Louisville/Jefferson County Metropolitan Sewer District (MSD) (Louisville/Jefferson County MSD — Single Family, Small Commercial or Demolition Permit, 'Bonds' section (also stated on the MSD Flood Permitting page)). Anyone constructing a new building or addition in, or immediately adjacent to, a mapped (FEMA or local regulatory) floodplain, who must post the bond before MSD issues the floodplain permit.
How much is the Louisville MSD Floodplain Elevation Certificate Bond?
The bond amount is $1,000.
How do I get the Louisville MSD Floodplain Elevation Certificate Bond?
This bond issues online — get bonded through our portal, usually in a single sitting once you confirm the bond, amount, and obligee.
What is the term?
Held until the final/finished-construction Elevation Certificate is reviewed and approved by MSD Renewal: Not applicable (per-project; released on Elevation Certificate approval)
Is this bond insurance for me?
No. It protects the obligee and the public — not you. If a valid claim is paid, you repay the surety.
How is this requirement verified?
We verify it against the obligee’s primary source (last checked 2026-06-05); the source link is on this page.

Get your bond online

Get Your Bond Online