Waite Park License and Permit Bond

What it is & who requires it

Contractors excavating in the Waite Park right of way. This is the line a carrier list for the city carries with no trade attached to it, and the trade is right-of-way excavation: the schedule places it under a heading covering right-of-way excavation permits and licenses, keyed to the ordinance section that governs them. Two neighboring items in the same schedule are worth pricing into a job here rather than discovering later. There is a permit extension fee if the work runs past its window, and there is a delay penalty charged per day — at one rate for minor and local streets and a materially higher rate for collector streets — so a stalled cut on a collector is expensive in a way a bond does not cover.

Obligee: City of Waite Park (Office of the City Engineer). Citation: City of Waite Park, Appendix B — Waite Park Schedule of Fee Charges, adopted 17 February 2026, under the heading RIGHT-OF-WAY EXCAVATION PERMITS, LICENSES: ordinance § 33.3, License and Permit Bond, $10,000.00; the same schedule sets § 33.4.2 Permit Extension Fee and § 33.4.3 Delay Penalty at a daily rate for minor and local streets and a higher daily rate for collector streets; Waite Park City Code ch. 33 (Right-of-Way Excavation Permits, Licenses).

Bond amount

The required bond amount is $10,000.

How to get it

This bond is individually underwritten, so it is not issued instantly. Request a quote and a licensed producer follows up to walk you through it.

Request a Quote

Request a bond quote

Tell us about the bond and the project. A licensed producer follows up — these bonds are individually underwritten, so they are not issued instantly.

Term & renewal

Term: Held as the license and permit bond behind the city’s right-of-way excavation permits and licenses.

Renewal: Runs with the license; the fee schedule that carries the amount is re-adopted by the council, most recently in February 2026.

Filing

Filed with the city. The figure renders because the city’s own currently-adopted fee schedule states a flat sum for the bond as a distinct line item, under the ordinance section that requires it, rather than a range or a minimum. ⚠ One limitation is recorded rather than smoothed over: Waite Park publishes no searchable code online, so the ordinance text behind § 33.3 could not be read directly and the amount rests on the adopted schedule alone. That is the city’s own operative document and it is current, but a contractor should ask the engineer to confirm the section’s wording — in particular whether the right-of-way chapter also carries a separate construction performance security of the kind most Minnesota cities took from the League model, which would be a different instrument at a different amount.

Source

Verified against the obligee source (last checked 2026-09-07).

Related Minnesota bonds

Frequently asked questions

Who requires the Waite Park License and Permit Bond?
It’s required by City of Waite Park (Office of the City Engineer) (City of Waite Park, Appendix B — Waite Park Schedule of Fee Charges, adopted 17 February 2026, under the heading RIGHT-OF-WAY EXCAVATION PERMITS, LICENSES: ordinance § 33.3, License and Permit Bond, $10,000.00; the same schedule sets § 33.4.2 Permit Extension Fee and § 33.4.3 Delay Penalty at a daily rate for minor and local streets and a higher daily rate for collector streets; Waite Park City Code ch. 33 (Right-of-Way Excavation Permits, Licenses)). Contractors excavating in the Waite Park right of way. This is the line a carrier list for the city carries with no trade attached to it, and the trade is right-of-way excavation: the schedule places it under a heading covering right-of-way excavation permits and licenses, keyed to the ordinance section that governs them. Two neighboring items in the same schedule are worth pricing into a job here rather than discovering later. There is a permit extension fee if the work runs past its window, and there is a delay penalty charged per day — at one rate for minor and local streets and a materially higher rate for collector streets — so a stalled cut on a collector is expensive in a way a bond does not cover.
How much is the Waite Park License and Permit Bond?
The bond amount is $10,000.
How do I get the Waite Park License and Permit Bond?
This bond is individually underwritten, so it is not issued instantly. Request a quote and a licensed producer follows up to walk you through it.
What is the term?
Held as the license and permit bond behind the city’s right-of-way excavation permits and licenses. Renewal: Runs with the license; the fee schedule that carries the amount is re-adopted by the council, most recently in February 2026.
Is this bond insurance for me?
No. It protects the obligee and the public — not you. If a valid claim is paid, you repay the surety.
How is this requirement verified?
We verify it against the obligee’s primary source (last checked 2026-09-07); the source link is on this page.