New York City DOT Construction Activity Permit Bond
What it is & who requires it
Any contractor or permittee performing building operations / construction activity in or over a New York City street or right-of-way (e.g. sidewalk sheds, scaffolds, hoists, material storage, crane/derrick work) under a NYC DOT permit must file a DOT permit bond.
Obligee: New York City Department of Transportation (Highway Operations / permit office). Citation: 34 RCNY (Highway Rules) § 2-02 (Permits — building operations / construction activity permits).
Bond amount
Set by the obligee — the exact amount is confirmed automatically when you start your bond in our portal, or call 317-942-0549.
How to get it
This bond issues online — get bonded through our portal, usually in a single sitting once you confirm the bond, amount, and obligee.
Term & renewal
Term: Annual (per calendar year); valid through the permit’s guarantee period.
Renewal: Annual; active permittees submit proof of insurance and bonds each year.
Filing
Any contractor performing building operations or construction activity in or over a New York City street under a DOT permit must file a permit bond with the Department of Transportation. This is a separate permit class from street openings, with its own bond schedule; the amount is set by whether you hold single or multiple locations in a calendar year, so it is listed and confirmed at issuance. The bond is filed annually. Authority: 34 RCNY (Highway Rules) § 2-02.
Source
This bond requirement is corroborated by multiple public sources; New York City Department of Transportation (Highway Operations / permit office) sets the exact amount, which we confirm when you start your bond.
Related New York bonds
Frequently asked questions
- Who requires the New York City DOT Construction Activity Permit Bond?
- It’s required by New York City Department of Transportation (Highway Operations / permit office) (34 RCNY (Highway Rules) § 2-02 (Permits — building operations / construction activity permits)). Any contractor or permittee performing building operations / construction activity in or over a New York City street or right-of-way (e.g. sidewalk sheds, scaffolds, hoists, material storage, crane/derrick work) under a NYC DOT permit must file a DOT permit bond.
- How much is the New York City DOT Construction Activity Permit Bond?
- Set by the obligee — the exact amount is confirmed automatically when you start your bond in our portal, or call 317-942-0549.
- How do I get the New York City DOT Construction Activity Permit Bond?
- This bond issues online — get bonded through our portal, usually in a single sitting once you confirm the bond, amount, and obligee.
- What is the term?
- Annual (per calendar year); valid through the permit’s guarantee period. Renewal: Annual; active permittees submit proof of insurance and bonds each year.
- Is this bond insurance for me?
- No. It protects the obligee and the public — not you. If a valid claim is paid, you repay the surety.
- How is this requirement verified?
- This bond requirement is corroborated by multiple public sources. The obligee sets the exact amount, which we confirm automatically when you start your bond in the portal or with a producer.