Midwest City Street Excavation Bond

What it is & who requires it

Contractors excavating in Midwest City streets or laying conduit under them. The gate is at the city engineer’s desk: the ordinance directs that the permit not be issued until the bond has been filed, so a lapse stops the permit rather than producing a notice. Midwest City also licenses house movers separately under its buildings chapter, so a contractor doing both files both.

Obligee: City of Midwest City (City Engineer). Citation: Midwest City Code of Ordinances § 37-88 (Bonds required) — permit not issued by the city engineer until the bond is filed; ch. 37 (Streets and Sidewalks), excavation and conduit permits.

Bond amount

The required bond amount is $10,000.

How to get it

This bond is individually underwritten, so it is not issued instantly. Request a quote and a licensed producer follows up to walk you through it.

Request a Quote

Request a bond quote

Tell us about the bond and the project. A licensed producer follows up — these bonds are individually underwritten, so they are not issued instantly.

Term & renewal

Term: Filed with the city before the excavation permit issues.

Renewal: Per permit or held with the license.

Filing

Filed with the city, executed by a surety company authorized to transact business in the state — the ordinance names the instrument, which is what carries the figure, and offers no cash or deposit alternative. Note that the same code carries surety bonds in lieu of cash utility deposits elsewhere; those are billing guarantees for utility accounts and are a different instrument entirely from this permit bond.

Source

Verified against the obligee source (last checked 2026-09-02).

Related Oklahoma bonds

Frequently asked questions

Who requires the Midwest City Street Excavation Bond?
It’s required by City of Midwest City (City Engineer) (Midwest City Code of Ordinances § 37-88 (Bonds required) — permit not issued by the city engineer until the bond is filed; ch. 37 (Streets and Sidewalks), excavation and conduit permits). Contractors excavating in Midwest City streets or laying conduit under them. The gate is at the city engineer’s desk: the ordinance directs that the permit not be issued until the bond has been filed, so a lapse stops the permit rather than producing a notice. Midwest City also licenses house movers separately under its buildings chapter, so a contractor doing both files both.
How much is the Midwest City Street Excavation Bond?
The bond amount is $10,000.
How do I get the Midwest City Street Excavation Bond?
This bond is individually underwritten, so it is not issued instantly. Request a quote and a licensed producer follows up to walk you through it.
What is the term?
Filed with the city before the excavation permit issues. Renewal: Per permit or held with the license.
Is this bond insurance for me?
No. It protects the obligee and the public — not you. If a valid claim is paid, you repay the surety.
How is this requirement verified?
We verify it against the obligee’s primary source (last checked 2026-09-02); the source link is on this page.

Request your bond

Request a Quote