What it is & who requires it

Any party performing construction or excavation within the City of Murfreesboro right-of-way or easements.

Obligee: City of Murfreesboro (Public Works / Water Resources). Citation: City of Murfreesboro ROW-Excavation Permit Instructions; Code Ch. 28, Art. III (Work Within/Excavation in Right-of-Way).

Bond amount

The ROW Permit Surety is established from the Engineer’s Cost Estimate for the work; no fixed dollar amount. May be satisfied by a surety bond (City’s required format) or a bank letter of credit. A $50 permit fee per street affected also applies.

How to get it

This bond issues online — get bonded through our portal, usually in a single sitting once you confirm the bond, amount, and obligee.

Get Your Bond Online Call 317-942-0549

Term & renewal

Term: Project duration; released after post-construction inspection

Renewal: Per-permit (project-based)

Filing

Filed per permit with the City of Murfreesboro (Public Works / Water Resources), the amount is built from the Engineer’s Cost Estimate for the work, and the bond is released after the post-construction inspection. A surety bond on the City’s required format or a bank letter of credit satisfies it. Required under the City’s ROW-Excavation Permit Instructions and Code Ch. 28, Art. III.

Source

Verified against the obligee source (last checked 2026-06-05).

Related Tennessee bonds

Frequently asked questions

Who requires the Murfreesboro Right-of-Way Permit Surety Bond?
It’s required by City of Murfreesboro (Public Works / Water Resources) (City of Murfreesboro ROW-Excavation Permit Instructions; Code Ch. 28, Art. III (Work Within/Excavation in Right-of-Way)). Any party performing construction or excavation within the City of Murfreesboro right-of-way or easements.
How much is the Murfreesboro Right-of-Way Permit Surety Bond?
The ROW Permit Surety is established from the Engineer’s Cost Estimate for the work; no fixed dollar amount. May be satisfied by a surety bond (City’s required format) or a bank letter of credit. A $50 permit fee per street affected also applies.
How do I get the Murfreesboro Right-of-Way Permit Surety Bond?
This bond issues online — get bonded through our portal, usually in a single sitting once you confirm the bond, amount, and obligee.
What is the term?
Project duration; released after post-construction inspection Renewal: Per-permit (project-based)
Is this bond insurance for me?
No. It protects the obligee and the public — not you. If a valid claim is paid, you repay the surety.
How is this requirement verified?
We verify it against the obligee’s primary source (last checked 2026-06-05); the source link is on this page.

Get your bond online

Get Your Bond Online