Sevierville (Sevier County, Tennessee) Street / ROW Excavation Bond
What it is & who requires it
Anyone excavating or tunneling in a City of Sevierville (Sevier County), Tennessee street or right-of-way.
Obligee: City of Sevierville, Sevier County, Tennessee (City Engineer). Citation: Sevierville Municipal Code §16-407.
Bond amount
Cash deposit OR, in lieu, a surety bond in such form and amount as the City Engineer deems adequate to cover the City’s restoration costs.
How to get it
This bond issues online — get bonded through our portal, usually in a single sitting once you confirm the bond, amount, and obligee.
Term & renewal
Term: Until restoration complete
Renewal: Per-permit
Filing
Filed with the City of Sevierville (Sevier County) and held until restoration is complete; a cash deposit may be posted, or, in lieu, a surety bond in the form and amount the City Engineer deems adequate, with a certificate of insurance also required. Required under Sevierville Municipal Code §16-407.
Source
Verified against the obligee source (last checked 2026-06-06).
Related Tennessee bonds
Frequently asked questions
- Who requires the Sevierville (Sevier County, Tennessee) Street / ROW Excavation Bond?
- It’s required by City of Sevierville, Sevier County, Tennessee (City Engineer) (Sevierville Municipal Code §16-407). Anyone excavating or tunneling in a City of Sevierville (Sevier County), Tennessee street or right-of-way.
- How much is the Sevierville (Sevier County, Tennessee) Street / ROW Excavation Bond?
- Cash deposit OR, in lieu, a surety bond in such form and amount as the City Engineer deems adequate to cover the City’s restoration costs.
- How do I get the Sevierville (Sevier County, Tennessee) Street / ROW Excavation Bond?
- This bond issues online — get bonded through our portal, usually in a single sitting once you confirm the bond, amount, and obligee.
- What is the term?
- Until restoration complete Renewal: Per-permit
- Is this bond insurance for me?
- No. It protects the obligee and the public — not you. If a valid claim is paid, you repay the surety.
- How is this requirement verified?
- We verify it against the obligee’s primary source (last checked 2026-06-06); the source link is on this page.