Fort Bend County Right-of-Way Performance Bond (utilities / misc work)

What it is & who requires it

Contractors installing utilities or doing miscellaneous work within Fort Bend County right-of-way.

Obligee: Fort Bend County, Texas. Citation: Fort Bend County Engineering Dept., Right-of-Way and Driveway Permits.

Bond amount

25 percent of the project cost, minimum $5,000.

How to get it

This bond is individually underwritten, so it is not issued instantly. Request a quote and a licensed producer follows up to walk you through it.

Request a Quote

Request a bond quote

Tell us about the bond and the project. A licensed producer follows up — these bonds are individually underwritten, so they are not issued instantly.

Term & renewal

Term: Per project

Renewal: Per project

Filing

An original executed bond required before Fort Bend County approves the permit for utility or miscellaneous work in the right-of-way; the amount is 25 percent of the project cost, subject to a minimum. Authority: Fort Bend County Engineering Dept., Right-of-Way and Driveway Permits.

Source

Verified against the obligee source (last checked 2026-06-07).

Related Texas bonds

Frequently asked questions

Who requires the Fort Bend County Right-of-Way Performance Bond (utilities / misc work)?
It’s required by Fort Bend County, Texas (Fort Bend County Engineering Dept., Right-of-Way and Driveway Permits). Contractors installing utilities or doing miscellaneous work within Fort Bend County right-of-way.
How much is the Fort Bend County Right-of-Way Performance Bond (utilities / misc work)?
25 percent of the project cost, minimum $5,000.
How do I get the Fort Bend County Right-of-Way Performance Bond (utilities / misc work)?
This bond is individually underwritten, so it is not issued instantly. Request a quote and a licensed producer follows up to walk you through it.
What is the term?
Per project Renewal: Per project
Is this bond insurance for me?
No. It protects the obligee and the public — not you. If a valid claim is paid, you repay the surety.
How is this requirement verified?
We verify it against the obligee’s primary source (last checked 2026-06-07); the source link is on this page.

Request your bond

Request a Quote