San Angelo Right-of-Way Construction and Completion Bond

What it is & who requires it

Contractors doing major construction on city property or within public ROW in San Angelo (over $50,000 estimated).

Obligee: City of San Angelo, Tom Green County, Texas. Citation: City of San Angelo Engineering Services Right-of-Way Policy (April 2022).

Bond amount

A penal sum equal to at least 100 percent of the City Engineer-approved estimated construction cost, triggered for major work exceeding $50,000 estimated cost.

How to get it

This bond is individually underwritten, so it is not issued instantly. Request a quote and a licensed producer follows up to walk you through it.

Request a Quote

Request a bond quote

Tell us about the bond and the project. A licensed producer follows up — these bonds are individually underwritten, so they are not issued instantly.

Term & renewal

Term: 1 year after final inspection

Renewal: Per project

Filing

Deposited with the San Angelo City Risk Manager for major construction on city property or within public right-of-way; the penal sum equals at least 100 percent of the City Engineer-approved estimated construction cost and it stays in force one year after final inspection. Authority: City of San Angelo Engineering Services Right-of-Way Policy (April 2022).

Source

Verified against the obligee source (last checked 2026-06-07).

Related Texas bonds

Frequently asked questions

Who requires the San Angelo Right-of-Way Construction and Completion Bond?
It’s required by City of San Angelo, Tom Green County, Texas (City of San Angelo Engineering Services Right-of-Way Policy (April 2022)). Contractors doing major construction on city property or within public ROW in San Angelo (over $50,000 estimated).
How much is the San Angelo Right-of-Way Construction and Completion Bond?
A penal sum equal to at least 100 percent of the City Engineer-approved estimated construction cost, triggered for major work exceeding $50,000 estimated cost.
How do I get the San Angelo Right-of-Way Construction and Completion Bond?
This bond is individually underwritten, so it is not issued instantly. Request a quote and a licensed producer follows up to walk you through it.
What is the term?
1 year after final inspection Renewal: Per project
Is this bond insurance for me?
No. It protects the obligee and the public — not you. If a valid claim is paid, you repay the surety.
How is this requirement verified?
We verify it against the obligee’s primary source (last checked 2026-06-07); the source link is on this page.

Request your bond

Request a Quote