San Angelo Right-of-Way Construction and Completion Bond
What it is & who requires it
Contractors doing major construction on city property or within public ROW in San Angelo (over $50,000 estimated).
Obligee: City of San Angelo, Tom Green County, Texas. Citation: City of San Angelo Engineering Services Right-of-Way Policy (April 2022).
Bond amount
A penal sum equal to at least 100 percent of the City Engineer-approved estimated construction cost, triggered for major work exceeding $50,000 estimated cost.
How to get it
This bond is individually underwritten, so it is not issued instantly. Request a quote and a licensed producer follows up to walk you through it.
Request a bond quote
Tell us about the bond and the project. A licensed producer follows up — these bonds are individually underwritten, so they are not issued instantly.
Term & renewal
Term: 1 year after final inspection
Renewal: Per project
Filing
Deposited with the San Angelo City Risk Manager for major construction on city property or within public right-of-way; the penal sum equals at least 100 percent of the City Engineer-approved estimated construction cost and it stays in force one year after final inspection. Authority: City of San Angelo Engineering Services Right-of-Way Policy (April 2022).
Source
Verified against the obligee source (last checked 2026-06-07).
Related Texas bonds
Frequently asked questions
- Who requires the San Angelo Right-of-Way Construction and Completion Bond?
- It’s required by City of San Angelo, Tom Green County, Texas (City of San Angelo Engineering Services Right-of-Way Policy (April 2022)). Contractors doing major construction on city property or within public ROW in San Angelo (over $50,000 estimated).
- How much is the San Angelo Right-of-Way Construction and Completion Bond?
- A penal sum equal to at least 100 percent of the City Engineer-approved estimated construction cost, triggered for major work exceeding $50,000 estimated cost.
- How do I get the San Angelo Right-of-Way Construction and Completion Bond?
- This bond is individually underwritten, so it is not issued instantly. Request a quote and a licensed producer follows up to walk you through it.
- What is the term?
- 1 year after final inspection Renewal: Per project
- Is this bond insurance for me?
- No. It protects the obligee and the public — not you. If a valid claim is paid, you repay the surety.
- How is this requirement verified?
- We verify it against the obligee’s primary source (last checked 2026-06-07); the source link is on this page.