Moses Lake Street and Utility Construction Bond

What it is & who requires it

Contractors performing street and utility construction in the City of Moses Lake right-of-way. The city requires a current bond on file before the work proceeds.

Obligee: City of Moses Lake (Construction Management). Citation: City of Moses Lake — Street and Utility Construction permit requirements (city-supplied Street and Utility Construction Bond).

Bond amount

Set by the obligee — the exact amount is confirmed automatically when you start your bond in our portal, or call 317-942-0549.

How to get it

This bond is individually underwritten, so it is not issued instantly. Request a quote and a licensed producer follows up to walk you through it.

Request a Quote

Request a bond quote

Tell us about the bond and the project. A licensed producer follows up — these bonds are individually underwritten, so they are not issued instantly.

Term & renewal

Term: A current bond must be on file with Construction Management for the duration of your work in the right-of-way.

Renewal: Kept current on file with the city; the bond is a standing instrument rather than a per-permit posting.

Filing

Filed with City of Moses Lake Construction Management, which requires a current city-supplied Street and Utility Construction Bond on file before you work in the right-of-way. This is one standing bond kept on file rather than an annual bond and a separate project bond — the city sizes it as a percentage above the total cost of the work in the right-of-way, so it is listed here and the required amount is confirmed when your project cost is set. It must be issued on the city’s own supplied form.

Source

This bond requirement is corroborated by multiple public sources; City of Moses Lake (Construction Management) sets the exact amount, which we confirm when you start your bond.

Related Washington bonds

Frequently asked questions

Who requires the Moses Lake Street and Utility Construction Bond?
It’s required by City of Moses Lake (Construction Management) (City of Moses Lake — Street and Utility Construction permit requirements (city-supplied Street and Utility Construction Bond)). Contractors performing street and utility construction in the City of Moses Lake right-of-way. The city requires a current bond on file before the work proceeds.
How much is the Moses Lake Street and Utility Construction Bond?
Set by the obligee — the exact amount is confirmed automatically when you start your bond in our portal, or call 317-942-0549.
How do I get the Moses Lake Street and Utility Construction Bond?
This bond is individually underwritten, so it is not issued instantly. Request a quote and a licensed producer follows up to walk you through it.
What is the term?
A current bond must be on file with Construction Management for the duration of your work in the right-of-way. Renewal: Kept current on file with the city; the bond is a standing instrument rather than a per-permit posting.
Is this bond insurance for me?
No. It protects the obligee and the public — not you. If a valid claim is paid, you repay the surety.
How is this requirement verified?
This bond requirement is corroborated by multiple public sources. The obligee sets the exact amount, which we confirm automatically when you start your bond in the portal or with a producer.

Request your bond

Request a Quote