Contractors pulling a Puyallup right-of-way permit for work that physically disturbs the right-of-way — excavation, tunnelling, paving, grading, sidewalk, curb, gutter, driveway, sewer, water main, or setting up traffic control. If you are occupying the right-of-way without disturbing it, the City’s separate occupation bond applies instead.
Obligee: City of Puyallup (City Engineer). Citation: Puyallup Municipal Code 11.05.070(1)(a) (performance bond — right-of-way work).
Bond amount
Set by the obligee — the exact amount is confirmed automatically when you start your bond in our portal, or call 317-942-0549.
How to get it
This bond is individually underwritten, so it is not issued instantly. Request a quote and a licensed producer follows up to walk you through it.
Request a bond quote
Tell us about the bond and the project. A licensed producer follows up — these bonds are individually underwritten, so they are not issued instantly.
Term & renewal
Term: Released at the City Engineer’s discretion once the permit is finaled and closed and a maintenance bond is provided. If no maintenance bond is provided it continues in force for two years after the city accepts the work.
Renewal: Per-permit. The surety may not cancel or let it expire during the required period except on at least thirty days' prior written notice by certified mail.
Filing
Filed with the City of Puyallup for a right-of-way permit covering work that disturbs the right-of-way. The amount is not a flat figure — Puyallup sets it as a percentage above the engineer-approved estimated cost of your work, so it is listed here and the required amount is confirmed when your estimate is approved. A high-volume contractor can post a single blanket performance bond with the City instead of bonding each permit separately. After the work is accepted a maintenance bond takes over; without one, this bond stays in force for two years. Authority is Puyallup Municipal Code 11.05.070(1)(a).
Source
This bond requirement is corroborated by multiple public sources; City of Puyallup (City Engineer) sets the exact amount, which we confirm when you start your bond.
Related Washington bonds
Frequently asked questions
- Who requires the Puyallup Performance Bond?
- It’s required by City of Puyallup (City Engineer) (Puyallup Municipal Code 11.05.070(1)(a) (performance bond — right-of-way work)). Contractors pulling a Puyallup right-of-way permit for work that physically disturbs the right-of-way — excavation, tunnelling, paving, grading, sidewalk, curb, gutter, driveway, sewer, water main, or setting up traffic control. If you are occupying the right-of-way without disturbing it, the City’s separate occupation bond applies instead.
- How much is the Puyallup Performance Bond?
- Set by the obligee — the exact amount is confirmed automatically when you start your bond in our portal, or call 317-942-0549.
- How do I get the Puyallup Performance Bond?
- This bond is individually underwritten, so it is not issued instantly. Request a quote and a licensed producer follows up to walk you through it.
- What is the term?
- Released at the City Engineer’s discretion once the permit is finaled and closed and a maintenance bond is provided. If no maintenance bond is provided it continues in force for two years after the city accepts the work. Renewal: Per-permit. The surety may not cancel or let it expire during the required period except on at least thirty days' prior written notice by certified mail.
- Is this bond insurance for me?
- No. It protects the obligee and the public — not you. If a valid claim is paid, you repay the surety.
- How is this requirement verified?
- This bond requirement is corroborated by multiple public sources. The obligee sets the exact amount, which we confirm automatically when you start your bond in the portal or with a producer.