West Virginia Land Disturbance / Stormwater Bond (General Use)

What it is & who requires it

Site developers and contractors performing land-disturbing activity in a West Virginia municipality with an MS4 / stormwater-management program that conditions its permit on a performance bond — for erosion-and-sediment control or stormwater-management measures — but that is not individually listed. The exact obligee and amount are confirmed at issuance.

Obligee: West Virginia municipal stormwater / erosion-control programs (general-use land-disturbance product).

Bond amount

Set by the obligee — the exact amount is confirmed automatically when you start your bond in our portal, or call 317-942-0549.

How to get it

This bond issues online — get bonded through our portal, usually in a single sitting once you confirm the bond, amount, and obligee.

Get Your Bond Online Call 317-942-0549

Term & renewal

Term: Tied to the land-disturbance / stormwater / erosion-and-sediment-control permit; held through final stabilization.

Renewal: Per permit; released after final stabilization.

Filing

This performance bond is filed with the West Virginia municipality whose stormwater or erosion-and-sediment-control program conditions your land-disturbance permit on a bond. It is tied to the permit and held through final stabilization of the site. The local program sets the amount based on the approved plan, so it is listed and the exact obligee and amount are confirmed when you apply.

Source

This bond requirement is corroborated by multiple public sources; West Virginia municipal stormwater / erosion-control programs (general-use land-disturbance product) sets the exact amount, which we confirm when you start your bond.

Related West Virginia bonds

Frequently asked questions

Who requires the West Virginia Land Disturbance / Stormwater Bond (General Use)?
It’s required by West Virginia municipal stormwater / erosion-control programs (general-use land-disturbance product). Site developers and contractors performing land-disturbing activity in a West Virginia municipality with an MS4 / stormwater-management program that conditions its permit on a performance bond — for erosion-and-sediment control or stormwater-management measures — but that is not individually listed. The exact obligee and amount are confirmed at issuance.
How much is the West Virginia Land Disturbance / Stormwater Bond (General Use)?
Set by the obligee — the exact amount is confirmed automatically when you start your bond in our portal, or call 317-942-0549.
How do I get the West Virginia Land Disturbance / Stormwater Bond (General Use)?
This bond issues online — get bonded through our portal, usually in a single sitting once you confirm the bond, amount, and obligee.
What is the term?
Tied to the land-disturbance / stormwater / erosion-and-sediment-control permit; held through final stabilization. Renewal: Per permit; released after final stabilization.
Is this bond insurance for me?
No. It protects the obligee and the public — not you. If a valid claim is paid, you repay the surety.
How is this requirement verified?
This bond requirement is corroborated by multiple public sources. The obligee sets the exact amount, which we confirm automatically when you start your bond in the portal or with a producer.

Get your bond online

Get Your Bond Online