Los Angeles Sewer / Storm Drain Connection Bond
What it is & who requires it
Contractors applying for permits to make sanitary sewer house connections or storm drain connections in the City of Los Angeles.
Obligee: City of Los Angeles, Los Angeles County, California. Citation: Los Angeles Municipal Code Sec. 64.15.1(b).
Bond amount
The required bond amount is $38,000.
How to get it
This bond issues online — get bonded through our portal, usually in a single sitting once you confirm the bond, amount, and obligee.
Term & renewal
Term: Continuous until cancelled
Renewal: Continuous
Filing
Filed on the official City form (Eng. 4.204) with the City of Los Angeles Administrative Officer, Risk Management, by a California-admitted surety for permits to make sanitary sewer or storm drain connections. Required under Los Angeles Municipal Code Sec. 64.15.1(b) and continuous until cancelled on sixty days’ notice.
Source
Verified against the obligee source (last checked 2026-06-07).
Related California bonds
Frequently asked questions
- Who requires the Los Angeles Sewer / Storm Drain Connection Bond?
- It’s required by City of Los Angeles, Los Angeles County, California (Los Angeles Municipal Code Sec. 64.15.1(b)). Contractors applying for permits to make sanitary sewer house connections or storm drain connections in the City of Los Angeles.
- How much is the Los Angeles Sewer / Storm Drain Connection Bond?
- The bond amount is $38,000.
- How do I get the Los Angeles Sewer / Storm Drain Connection Bond?
- This bond issues online — get bonded through our portal, usually in a single sitting once you confirm the bond, amount, and obligee.
- What is the term?
- Continuous until cancelled Renewal: Continuous
- Is this bond insurance for me?
- No. It protects the obligee and the public — not you. If a valid claim is paid, you repay the surety.
- How is this requirement verified?
- We verify it against the obligee’s primary source (last checked 2026-06-07); the source link is on this page.