Dacono Excavation Permit Bond
What it is & who requires it
Permittees excavating in Dacono. The security insures that the excavation and surface restoration are made in full compliance with the excavation article and the terms of the permit. Two features are worth planning around. Restoration is defined tightly — the surface must be returned to the general level of the ground, including street or sidewalk surfacing, in the area where the excavation was made, and no excavation may be undercut or wider at the bottom than the top. And half of any street, alley or public right-of-way must stay untouched for traffic until the other half is restored for safe use. Communications facility installations that entail excavating a public highway must show proof of bonding under this same section.
Obligee: City of Dacono (City Engineer; City Council). Citation: Dacono Municipal Code § 11-5 (Performance bond); § 11-6 (Notice of work); § 11-10 (Cure of defects); § 11-124(c) (proof of bonding for communications facility excavation); Ord. 476 § 1, 1996.
Bond amount
Set by the obligee — the exact amount is confirmed automatically when you start your bond in our portal, or call 317-942-0549.
How to get it
This bond is individually underwritten, so it is not issued instantly. Request a quote and a licensed producer follows up to walk you through it.
Request a bond quote
Tell us about the bond and the project. A licensed producer follows up — these bonds are individually underwritten, so they are not issued instantly.
Term & renewal
Term: In full force and effect for one year after completion and acceptance of the work by the city.
Renewal: Per permit.
Filing
Provided to the City before the permit issues. No figure appears here for two independent reasons. The instrument is co-equal in the ordinance’s own words — a cash deposit, a surety bond, or other form of guarantee acceptable to the city — and the amount is a formula rather than a sum: sufficient to cover estimated closing and restoration expenses as estimated by the city engineer, or a published floor, whichever is greater. A third route exists for some applicants: at the city council’s discretion a letter of responsibility may be accepted in lieu of the deposit or bond from any public utility company, special district or school district. If the city finds a violation it notifies both the permittee and the surety on the bond, describing the curative work, its estimated cost and a reasonable time to complete it. Authority: Dacono Municipal Code § 11-5.
Source
This bond requirement is corroborated by multiple public sources; City of Dacono (City Engineer; City Council) sets the exact amount, which we confirm when you start your bond.
Related Colorado bonds
Frequently asked questions
- Who requires the Dacono Excavation Permit Bond?
- It’s required by City of Dacono (City Engineer; City Council) (Dacono Municipal Code § 11-5 (Performance bond); § 11-6 (Notice of work); § 11-10 (Cure of defects); § 11-124(c) (proof of bonding for communications facility excavation); Ord. 476 § 1, 1996). Permittees excavating in Dacono. The security insures that the excavation and surface restoration are made in full compliance with the excavation article and the terms of the permit. Two features are worth planning around. Restoration is defined tightly — the surface must be returned to the general level of the ground, including street or sidewalk surfacing, in the area where the excavation was made, and no excavation may be undercut or wider at the bottom than the top. And half of any street, alley or public right-of-way must stay untouched for traffic until the other half is restored for safe use. Communications facility installations that entail excavating a public highway must show proof of bonding under this same section.
- How much is the Dacono Excavation Permit Bond?
- Set by the obligee — the exact amount is confirmed automatically when you start your bond in our portal, or call 317-942-0549.
- How do I get the Dacono Excavation Permit Bond?
- This bond is individually underwritten, so it is not issued instantly. Request a quote and a licensed producer follows up to walk you through it.
- What is the term?
- In full force and effect for one year after completion and acceptance of the work by the city. Renewal: Per permit.
- Is this bond insurance for me?
- No. It protects the obligee and the public — not you. If a valid claim is paid, you repay the surety.
- How is this requirement verified?
- This bond requirement is corroborated by multiple public sources. The obligee sets the exact amount, which we confirm automatically when you start your bond in the portal or with a producer.