Cromwell Drain Layer Bond

What it is & who requires it

A licensed drain layer connecting to or working on the public sewer and drain system in Cromwell must post a drain layer’s bond, guaranteeing compliance with Town of Cromwell’s requirements and restoration of any surface disturbed for the connection.

Obligee: Town of Cromwell. Citation: Code of the Town of Cromwell, Ch. 193 (Sewers), §193-8.

Bond amount

Set by the obligee — the exact amount is confirmed automatically when you start your bond in our portal, or call 317-942-0549.

How to get it

This bond is individually underwritten, so it is not issued instantly. Request a quote and a licensed producer follows up to walk you through it.

Request a Quote

Request a bond quote

Tell us about the bond and the project. A licensed producer follows up — these bonds are individually underwritten, so they are not issued instantly.

Term & renewal

Term: Held while the drain-layer license is in effect; a current bond is a precondition to sewer/drain connection work.

Renewal: Maintained while the drain layer is licensed to work on the Cromwell sewer and drain system.

Filing

Provided to the Cromwell Sewer Authority by a licensed drain layer connecting to the public sewer, under Town Code §193-8 (Chapter 193, Sewers), in an amount the Sewer Authority specifies at or above a stated minimum. It is listed and the exact amount is confirmed when you apply.

Source

Verified against the obligee source.

Related Connecticut bonds

Frequently asked questions

Who requires the Cromwell Drain Layer Bond?
It’s required by Town of Cromwell (Code of the Town of Cromwell, Ch. 193 (Sewers), §193-8). A licensed drain layer connecting to or working on the public sewer and drain system in Cromwell must post a drain layer’s bond, guaranteeing compliance with Town of Cromwell’s requirements and restoration of any surface disturbed for the connection.
How much is the Cromwell Drain Layer Bond?
Set by the obligee — the exact amount is confirmed automatically when you start your bond in our portal, or call 317-942-0549.
How do I get the Cromwell Drain Layer Bond?
This bond is individually underwritten, so it is not issued instantly. Request a quote and a licensed producer follows up to walk you through it.
What is the term?
Held while the drain-layer license is in effect; a current bond is a precondition to sewer/drain connection work. Renewal: Maintained while the drain layer is licensed to work on the Cromwell sewer and drain system.
Is this bond insurance for me?
No. It protects the obligee and the public — not you. If a valid claim is paid, you repay the surety.
How is this requirement verified?
This bond requirement is corroborated by multiple public sources. The obligee sets the exact amount, which we confirm automatically when you start your bond in the portal or with a producer.

Request your bond

Request a Quote