Wallingford Water and Sewer Bond

What it is & who requires it

A contractor performing water-service or sewer-connection work in Wallingford must post the Department of Public Utilities Water and Sewer Division bond before the work, running to the Town of Wallingford.

Obligee: Town of Wallingford. Citation: Town of Wallingford Code, Ch. 177 (Sewers); Department of Public Utilities — Water and Sewer Divisions.

Bond amount

Set by the obligee — the exact amount is confirmed automatically when you start your bond in our portal, or call 317-942-0549.

How to get it

This bond issues online — get bonded through our portal, usually in a single sitting once you confirm the bond, amount, and obligee.

Get Your Bond Online Call 317-942-0549

Term & renewal

Term: Held while the contractor performs water-service or sewer-connection work in Wallingford under the Department of Public Utilities.

Renewal: Maintained while the contractor is authorized to work on the Town’s water and sewer infrastructure.

Filing

Filed with the Town of Wallingford Department of Public Utilities (Water and Sewer Divisions) before performing water-service or sewer-connection work, with the sewer system governed by Town Code Chapter 177. It is listed and the exact amount is confirmed when you apply.

Source

Verified against the obligee source.

Related Connecticut bonds

Frequently asked questions

Who requires the Wallingford Water and Sewer Bond?
It’s required by Town of Wallingford (Town of Wallingford Code, Ch. 177 (Sewers); Department of Public Utilities — Water and Sewer Divisions). A contractor performing water-service or sewer-connection work in Wallingford must post the Department of Public Utilities Water and Sewer Division bond before the work, running to the Town of Wallingford.
How much is the Wallingford Water and Sewer Bond?
Set by the obligee — the exact amount is confirmed automatically when you start your bond in our portal, or call 317-942-0549.
How do I get the Wallingford Water and Sewer Bond?
This bond issues online — get bonded through our portal, usually in a single sitting once you confirm the bond, amount, and obligee.
What is the term?
Held while the contractor performs water-service or sewer-connection work in Wallingford under the Department of Public Utilities. Renewal: Maintained while the contractor is authorized to work on the Town’s water and sewer infrastructure.
Is this bond insurance for me?
No. It protects the obligee and the public — not you. If a valid claim is paid, you repay the surety.
How is this requirement verified?
This bond requirement is corroborated by multiple public sources. The obligee sets the exact amount, which we confirm automatically when you start your bond in the portal or with a producer.

Get your bond online

Get Your Bond Online