Gainesville Right-of-Way Obstruction / Excavation Bond

What it is & who requires it

Contractors / permittees performing excavation or obstruction work within the City of Gainesville public right-of-way.

Obligee: City of Gainesville. Citation: City of Gainesville Code Sec. 23-107 (Ch. 23 Art. V).

Bond amount

A sum established by the Public Works Director reasonably corresponding to the nature and extent of the right-of-way work; a surety bond is an expressly allowed form (also letter of credit).

How to get it

This bond issues online — get bonded through our portal, usually in a single sitting once you confirm the bond, amount, and obligee.

Get Your Bond Online Call 317-942-0549

Term & renewal

Term: Per permit; an 18-month post-construction maintenance period may apply; 60-day cancellation notice to the city

Renewal: Per project

Filing

Filed with the City of Gainesville for excavation or obstruction work in the public right-of-way, as a surety bond or letter of credit in a sum established by the Public Works Director. It is posted per project, may carry an 18-month post-construction maintenance period, and requires 60 days notice before cancellation. Required under City of Gainesville Code Sec. 23-107.

Source

Verified against the obligee source (last checked 2026-06-07).

Related Florida bonds

Frequently asked questions

Who requires the Gainesville Right-of-Way Obstruction / Excavation Bond?
It’s required by City of Gainesville (City of Gainesville Code Sec. 23-107 (Ch. 23 Art. V)). Contractors / permittees performing excavation or obstruction work within the City of Gainesville public right-of-way.
How much is the Gainesville Right-of-Way Obstruction / Excavation Bond?
A sum established by the Public Works Director reasonably corresponding to the nature and extent of the right-of-way work; a surety bond is an expressly allowed form (also letter of credit).
How do I get the Gainesville Right-of-Way Obstruction / Excavation Bond?
This bond issues online — get bonded through our portal, usually in a single sitting once you confirm the bond, amount, and obligee.
What is the term?
Per permit; an 18-month post-construction maintenance period may apply; 60-day cancellation notice to the city Renewal: Per project
Is this bond insurance for me?
No. It protects the obligee and the public — not you. If a valid claim is paid, you repay the surety.
How is this requirement verified?
We verify it against the obligee’s primary source (last checked 2026-06-07); the source link is on this page.