Idaho Land Disturbance Bond

What it is & who requires it

Contractors, developers and site-work firms in Idaho who clear, grade, excavate or otherwise disturb ground under a local grading, erosion-control or storm-water permit. Idaho jurisdictions bond this work to guarantee that erosion and sediment controls go in and are maintained, that the disturbed area is stabilized, and that the city, county or highway district is not left to clear sediment tracked into the street or discharged into the storm drain. Where the same project also disturbs a public right-of-way or installs a subsurface sewage system, those carry their own separate bonds.

Obligee: Idaho city, county and highway-district engineering and storm-water departments (general-use land-disturbance / erosion-control product). Citation: Idaho municipal and county grading, erosion-control and storm-water ordinances (multi-obligee); Idaho Department of Environmental Quality storm-water and subsurface-sewage programmes.

Bond amount

Set by the obligee — the exact amount is confirmed automatically when you start your bond in our portal, or call 317-942-0549.

How to get it

This bond is individually underwritten, so it is not issued instantly. Request a quote and a licensed producer follows up to walk you through it.

Request a Quote

Request a bond quote

Tell us about the bond and the project. A licensed producer follows up — these bonds are individually underwritten, so they are not issued instantly.

Term & renewal

Term: Held until the disturbed ground is stabilized and the permanent controls are accepted.

Renewal: Per permit, released as the site is stabilized and the controls are accepted.

Filing

Filed with the Idaho city, county or highway district that issues your grading, erosion-control or storm-water permit. Idaho has no single statewide land-disturbance bond: jurisdictions differ in what they require and most size the amount against an engineer’s estimate of the cost of installing and maintaining the controls and stabilizing the site rather than publishing a figure, and several will accept a cash deposit or a letter of credit instead of a bond — so the obligee and the exact amount are confirmed when you apply. It is released as the site is stabilized and the permanent controls are accepted. Where your work is also in the right-of-way, that permit carries its own bond.

Source

This bond requirement is corroborated by multiple public sources; Idaho city, county and highway-district engineering and storm-water departments (general-use land-disturbance / erosion-control product) sets the exact amount, which we confirm when you start your bond.

Related Idaho bonds

Frequently asked questions

Who requires the Idaho Land Disturbance Bond?
It’s required by Idaho city, county and highway-district engineering and storm-water departments (general-use land-disturbance / erosion-control product) (Idaho municipal and county grading, erosion-control and storm-water ordinances (multi-obligee); Idaho Department of Environmental Quality storm-water and subsurface-sewage programmes). Contractors, developers and site-work firms in Idaho who clear, grade, excavate or otherwise disturb ground under a local grading, erosion-control or storm-water permit. Idaho jurisdictions bond this work to guarantee that erosion and sediment controls go in and are maintained, that the disturbed area is stabilized, and that the city, county or highway district is not left to clear sediment tracked into the street or discharged into the storm drain. Where the same project also disturbs a public right-of-way or installs a subsurface sewage system, those carry their own separate bonds.
How much is the Idaho Land Disturbance Bond?
Set by the obligee — the exact amount is confirmed automatically when you start your bond in our portal, or call 317-942-0549.
How do I get the Idaho Land Disturbance Bond?
This bond is individually underwritten, so it is not issued instantly. Request a quote and a licensed producer follows up to walk you through it.
What is the term?
Held until the disturbed ground is stabilized and the permanent controls are accepted. Renewal: Per permit, released as the site is stabilized and the controls are accepted.
Is this bond insurance for me?
No. It protects the obligee and the public — not you. If a valid claim is paid, you repay the surety.
How is this requirement verified?
This bond requirement is corroborated by multiple public sources. The obligee sets the exact amount, which we confirm automatically when you start your bond in the portal or with a producer.

Request your bond

Request a Quote