Salt Lake County Excavation Completion Bond
What it is & who requires it
Contractors and utilities who tunnel under or excavate in a street, alley or other public place in unincorporated Salt Lake County. No permit is issued until the applicant has posted a completion bond with the county engineering division, sufficient to reasonably insure proper restoration of the ground and the laying of pavement. If the applicant fails to perform, the county’s cost of restoring the surface comes out of the bond and the balance is returned. Water conservancy districts, sewage districts and other entities that may be exempt from bonding provisions still apply for the permit and still must restore the cut surface, indemnify the county and pay the fees.
Obligee: Salt Lake County (Engineering Division; Public Works). Citation: Salt Lake County Code of Ordinances § 14.16.060 (Completion bond); Title 14 Ch. 14.16 Excavations.
Bond amount
Set by the obligee — the exact amount is confirmed automatically when you start your bond in our portal, or call 317-942-0549.
How to get it
This bond is individually underwritten, so it is not issued instantly. Request a quote and a licensed producer follows up to walk you through it.
Request a bond quote
Tell us about the bond and the project. A licensed producer follows up — these bonds are individually underwritten, so they are not issued instantly.
Term & renewal
Term: Three years — the bond guarantees restoration of the worksite for three years from the completion date of the restoration, reasonable wear and tear excepted.
Renewal: Per permit. A separate completion bond is not required where restoration of the ground and the laying of pavement is already specifically covered by another bond.
Filing
Posted with the Salt Lake County engineering division before your excavation permit is issued. The ordinance names no figure whatever: the amount is determined by the engineering division and must be sufficient to reasonably insure the proper restoration of the ground and the laying of pavement, so it tracks the scope of your particular cut. That is why the bond is listed here and the amount is confirmed when you apply. It guarantees restoration of the worksite for three years from the completion date of the restoration. A separate completion bond is not required where the restoration and paving are specifically covered under another bond. Certificates of insurance are filed with the permit, and a utility or a property owner working next to their own residence may satisfy that with evidence of insurance or adequate self-insurance; utilities may file evidence annually instead of per permit. If a cut is not repaired after written notice, the county may do the work and bill the excavator. Authority: Salt Lake County Code § 14.16.060.
Source
This bond requirement is corroborated by multiple public sources; Salt Lake County (Engineering Division; Public Works) sets the exact amount, which we confirm when you start your bond.
Related Utah bonds
Frequently asked questions
- Who requires the Salt Lake County Excavation Completion Bond?
- It’s required by Salt Lake County (Engineering Division; Public Works) (Salt Lake County Code of Ordinances § 14.16.060 (Completion bond); Title 14 Ch. 14.16 Excavations). Contractors and utilities who tunnel under or excavate in a street, alley or other public place in unincorporated Salt Lake County. No permit is issued until the applicant has posted a completion bond with the county engineering division, sufficient to reasonably insure proper restoration of the ground and the laying of pavement. If the applicant fails to perform, the county’s cost of restoring the surface comes out of the bond and the balance is returned. Water conservancy districts, sewage districts and other entities that may be exempt from bonding provisions still apply for the permit and still must restore the cut surface, indemnify the county and pay the fees.
- How much is the Salt Lake County Excavation Completion Bond?
- Set by the obligee — the exact amount is confirmed automatically when you start your bond in our portal, or call 317-942-0549.
- How do I get the Salt Lake County Excavation Completion Bond?
- This bond is individually underwritten, so it is not issued instantly. Request a quote and a licensed producer follows up to walk you through it.
- What is the term?
- Three years — the bond guarantees restoration of the worksite for three years from the completion date of the restoration, reasonable wear and tear excepted. Renewal: Per permit. A separate completion bond is not required where restoration of the ground and the laying of pavement is already specifically covered by another bond.
- Is this bond insurance for me?
- No. It protects the obligee and the public — not you. If a valid claim is paid, you repay the surety.
- How is this requirement verified?
- This bond requirement is corroborated by multiple public sources. The obligee sets the exact amount, which we confirm automatically when you start your bond in the portal or with a producer.